News

Project Update - 2023

25 January 2023

Forming part of the City’s primary ATC network, the Houghton Road ATC runs east-west with an eastern terminus located at the intersection of Mugford Road and Rutland Road, and a western connection to the Okanagan Rail Trail located approximately 2.6 km to the west, connecting the Rutland neighborhood to the rail trail and beyond.

The final phase of the Houghton ATC, Phase 3, is expected to start construction Spring of 2023. Phases 2 and 3 have been designed to generally follow the phase 1 cross section’s 4.0 m wide multi-use path, providing for a consistent and uniform ATC corridor for end users.